Saturday, July 27, 2013

Day 60 - Framing (Mostly) Complete plus Roofing and Plumbing

Last week, our family got the chance to go away on vacation in Destin, Florida while they mostly completed the framing of the house (they still need to frame the corner tub in our bathroom and maybe the fireplace). They also got most of the roof shingled and the plumber started installing all of the drain piping in the house. After a long overnight drive from Destin to Cincinnati, and a nice nap, we went over the house to take a bunch of pics (as you can see below). This was an especially exciting time because this was the first time that the kids got to see their rooms since the stairs were also installed while we were gone. The kids were so excited to see their rooms and their bathrooms. Alli already is planning her room color and layout (hot pink walls and a hot pink rug). Enjoy the pics!

Master bedroom.

Walk-in closet.

Master bath.

Drain for shower in master bath.

Plumbing for master bath vanity.


Jake's bedroom.

Foyer view from above.


View from second floor.

Rear bath.

Kara's bedroom.

Alli's bedroom.

Sami's bedroom.

Sami in the front bathroom (notice that she is still in her jammies from the overnight car ride).


Kitchen and breakfast nook (with door to deck).

Great room.

Front door (it's a little dirty).

Laundry room with washer/dryer hook up.

Stairs in basement.

Basement half bathroom.

My office.

Finished basement.

Double doors leading to patio.


Looking up from the foyer.

Foyer and coat closet.




No comments:

Post a Comment