Tuesday, October 29, 2013

Day 150 - Driveway Pouring, Trim and Door Painting; Day 154 - Deck, Siding, and Plumbing Fixtures

It has been several days since we have posted anything. I was out of town last week and not a ton of big things have happened until the past few day. One big thing that we are dealing with right now is our laundry room issue. The cabinet design does not match our washer and dryer or any other washer and dryer for that matter. We have a garbage can drawer that you couldn't even open. So it's back to the drawing board for that...new cabinets and countertop has been ordered today and should be here in two weeks. So I am guessing that will push off our move in date to the week of November 18th...the week of my birthday. We shall see...

Here are some pictures from day 150 and further down from day 154. We happened to drive by after we took the kids to school the day after I got back from Missouri. We got to see them pouring the driveway and some progress on the deck and interior trim painting. Pics below:





Very clever way to paint a bunch of doors...

On day 154, I ran up to the house to see if some screws that I bought for the vanity hardware would work and got to see some more progress. Toilets in, most plumbing fixtures installed except for the kitchen and half baths. I got some more detailed pictures of the stone along with the driveway and sidewalks. They currently have some breaks in the sidewalk so the bull dozer can get back for final grading. Also have pictures of the siding finally put on the back and more deck updates. Enjoy!




Upstairs hall closet.



Excess wood burn pile.

Pretty fall view from Alli's room.

Siding

Front porch and sidewalk





Gap in sidewalk to allow bull dozer access to the yard.

I'm guessing this is the water access?


Our soon to be home sweet home...

No comments:

Post a Comment